Brief Description: Roll over bar installation and aft fuselage riveti
I started the day by completing the roll over bar installation. The F-732A channel was joined to the F-631 rollover bar at the foward end with three angles and the F-631 rollover bar was match drilled at the base to the F-631C and F-631D angles. Then my brother Bernie dropped in so we riveted the aft upper fusealge skin on.